FLOOR SCREEDING IN OLD HILL
Floors Laid Level And Built To Last
Most of the screeding work we're called out for in Old Hill is either levelling an old, uneven suspended-timber or concrete floor before new flooring goes down, or laying a fresh screed as part of an extension or garage conversion. Self-levelling flow screed suits underfloor heating and tight timescales, it self-levels and can often be walked on within a day or two, while a full drying-out period still applies before flooring is fixed down. Traditional sand and cement screed is the sturdier, more cost-effective choice for garages and standard floor build-ups. If your street is right on that line, it's worth confirming which authority applies before booking structural work, we'll check at the quote stage. Larger structural floor changes tied into an extension may need building-control sign-off through Sandwell Council, straightforward re-screeds don't, and we'll flag it if your job needs it.
A traditional, cost-effective screed for standard Old Hill floor build-ups and garages.
Fast-curing, self-levelling screed ideal for tight timescales and underfloor heating systems.
Uneven or sloping Old Hill floors levelled out before tiles, LVT or carpet go down.
Durable screed for Old Hill garages and outbuildings, built to take real weight.
JAMIE PLASTERPERFECT
Why Old Hill Homeowners Choose Us
WHAT OUR CUSTOMERS SAY
Our Reviews
Get A Free Old Hill Quote
Send a few details or photos and we'll get back to you with a clear, honest price.
Nearby Areas We Also Cover
Old Hill Floor Screeding FAQs
How much does floor screeding cost in Old Hill?
It depends on the floor area, the screed type and any preparation needed underneath. We give every enquiry a free, itemised quote before any work starts.
Do you cover all of Old Hill, or just parts of it?
All of it, including Blackheath and Netherton, Old Hill is one of our regular working areas.
How long does floor screed take to dry before I can walk on it?
Self-levelling screed is often walkable within a day or two. As a rule of thumb, screed dries at roughly 1mm a day before flooring can go down, so a 50mm screed needs a proper drying period, not a guess.
Is self-levelling screed the same as traditional screed?
No. Traditional sand and cement screed is hand-laid and more forgiving on cost, self-levelling flow screed pumps in and levels itself, and suits underfloor heating and faster turnarounds.
Do you lay screed for underfloor heating in Old Hill homes?
Yes, screed depth and type both matter for underfloor heating performance, we'll size it correctly for your system rather than a one-size-fits-all depth.
Can you level an uneven concrete floor in my Old Hill property before I tile or lay LVT?
Yes, a levelling compound or full screed depending on how uneven it is and what's going on top.
Why has my screed cracked?
Usually laid too thin, dried too fast, or laid without the right movement joints. We'll assess the cause before recommending a fix.
Can you screed a garage floor in Old Hill to take a car's weight?
Yes, a properly laid sand and cement screed at the right depth handles vehicle weight without issue.
What preparation do you need before screeding starts?
A sound, clean substrate, and a damp-proof membrane where damp is a risk. We'll check this on the visit and flag anything that needs sorting first.
Do you offer a guarantee on screeding work?
Yes, ask for the specifics when you get your quote.
Do you provide free quotes for Old Hill screeding jobs?
Always, call, WhatsApp or use the form above with the floor area and what it's for and we'll come back with a clear price.
